Concrete railway sleepers stacked in a stockyard at sunset

Supplies · Contracting · Maintenance

Supplied, built
and maintained.

Railway spare parts and rolling stock, heavy vehicles and equipment, contracting and maintenance — for government, public-sector and private clients in Egypt.

Trusted byGovernment bodiesPublic-sector companiesSovereign entitiesMinistry of TransportInternational investors

Who we are

One Egyptian company that sources, imports, builds, represents and maintains — and answers for the whole chain.

75
Projects on record
2.9bn
EGP contract value delivered
1989
First project on record
3
Lines: supply, contracting, maintenance
MAN heavy trucks lined up for deliverySlab reinforcement on a construction site

Core line

Railway bearings & parts

What we do

Three lines of work.
One counterpart.

ثلاثة مجالات. جهة واحدة مسؤولة.

Supply, contracting and maintenance under one contract owner — so responsibility never falls between companies.

General Supplies
01التوريدات العامة

General Supplies

Local and international supply — railway bearings and spare parts, rolling stock, track materials, MAN trucks, Land Cruiser 79 and industrial equipment.

  • Railway parts & bearings
  • Rolling stock & sleepers
  • Vehicles & handling
  • Electromechanical
General Contracting
02المقاولات العامة

General Contracting

Buildings, factories, treatment plants, infrastructure, landscape and hardscape for public and private clients.

  • Buildings & compounds
  • Industrial & warehouses
  • Water & wastewater
  • Landscape & hardscape
Maintenance
03الصيانة

Maintenance

Preventive, corrective and multi-year maintenance contracts — with parts supplied by the same company.

  • Rolling stock & wheelsets
  • Fleets & heavy vehicles
  • Machinery & lines
  • Pumps & MEP

Commercial Agencies

الوكالات التجارية

Representation and dealerships for manufacturers entering Egypt — from registration to after-sales.

Global Partnerships

الشراكات الدولية

A network of leading state-owned manufacturers, and a route to building factories in Egypt.

Core line · Railway bearings

Every axle turns
on its bearings.

رولمان بلي السكك الحديدية

Axlebox, traction-motor and gearbox bearings for wagons, coaches, locomotives, metro and high-speed trains — certified, documented and matched to the fleet in service.

Typed × D × C (mm)Design / loadSpeedRated life
352226X2-2RZ130 × 230 × 15021 t axle load≤ 120 km/h800,000 km / 8 yrs
353130B150 × 250 × 16025 t axle load≤ 120 km/h800,000 km / 8 yrs
352226A130 × 230 × 16018 t axle load≤ 160 km/h800,000 km / 8 yrs
353132A160 × 270 × 17030 t axle load≤ 120 km/h800,000 km / 8 yrs

3.2m km

High-speed rated life

400 km/h

Top service speed

AAR · TSI

Partner certifications

Open-top wagon
Open-top wagon01
Covered wagon
Covered wagon02
Tank wagon
Tank wagon03
Hopper wagon
Hopper wagon04
Flat & container
Flat & container05
Side-dump wagon
Side-dump wagon06

How we work

From the first request
to after-sales.

منهجية العمل

The same six steps whether you buy bearings, a building or a maintenance contract. One team owns the whole chain.

  1. 01

    Request

    Specification, quantities and standards confirmed with your engineers.

  2. 02

    Offer

    Qualified source, method or partner — and a compliant technical and commercial offer.

  3. 03

    Contract

    Orders placed, plan agreed, reporting set up.

  4. 04

    Production

    Inspection, shipping and customs — or site mobilisation.

  5. 05

    Handover

    Delivered, tested and handed over with full records.

  6. 06

    After-sales

    Warranty, spare parts and maintenance contracts.

Project experience

A record built for
the state and the market.

سابقة الأعمال

Sovereign and government bodies, public-sector companies, international industrial investors and national developers.

Royal Palm Beach Hotel, Hurghada

Featured · Hotels & resorts

Royal Palm Beach Hotel, Hurghada

Construction of a 350-room hotel on 60,000 m², including the main building, swimming pool, and soft and hard landscape.

Value
EGP 200 m
Area
60,000 m²
Year
2005
Luxor Corniche, City Gates and Roundabouts

Luxor City Council2001

Luxor Corniche, City Gates and Roundabouts

EGP 10 m

Beltag Wastewater Treatment Plant

Gharbia Water & Wastewater Company (HCWW)2018

Beltag Wastewater Treatment Plant

EGP 200 m

Water Desalination Plant, Sokhna

Egyptian Fertilizers Company2005

Water Desalination Plant, Sokhna

EGP 35 m

Abou Rawash Warehouses

Egyptian Company for Storage Services2005

Abou Rawash Warehouses

EGP 77 m

Fiberglass Factory, Sokhna

Jushi Egypt for Fiber Glass Industry S.A.E2012

Fiberglass Factory, Sokhna

EGP 85 m

F5 Factory, Sokhna

Egypt’s Suez China Real Estate Development2008

F5 Factory, Sokhna

EGP 16 m

Cairo Business Park

Misr Italia Properties2017

Cairo Business Park

EGP 95 m

SODIC Caesar (Phases 1 & 2) – Ras El Hekma

SODIC (Tabrook for Development)2015

SODIC Caesar (Phases 1 & 2) – Ras El Hekma

EGP 75 m

Mövenpick Hotel Extension, Al Haram

Tourism Urbanization Company2009

Mövenpick Hotel Extension, Al Haram

EGP 45 m

Automatic bearing production line at a partner plantConcrete sleeper plant

Partner families

  • Railway bearings
  • Rolling stock
  • Track materials
  • Material handling

Global partnerships

Global industry,
built in Egypt.

الشراكات الدولية ونقل التكنولوجيا

A very large network of relationships with leading state-owned manufacturers — used to supply Egypt today, and to bring factories and technology into the country tomorrow.

  1. 01

    Supply

    Certified products from partner plants, delivered to specification.

  2. 02

    Local assembly & overhaul

    Workshops in Egypt, with partner technology.

  3. 03

    Local manufacturing

    Joint ventures, licensing and direct investment.

Who we serve

Built for clients with
public responsibility.

عملاؤنا

Projects that carry public responsibility need complete documentation, strict compliance and one accountable counterpart.

Ministry of Transport

Railway parts, rolling stock, track materials and fleets.

Government bodies

Supply, construction and maintenance to procurement standards.

Sovereign entities

Discretion, compliance and a single accountable counterpart.

Public-sector companies

Equipment, plants and maintenance that protect continuity.

Private companies

The same discipline for developers and manufacturers.

Quality & compliance

Every file complete
before anyone asks.

Certificates of origin and conformity, inspection and test records, handover files and as-built documentation — prepared for audit with every delivery.

  • ISO 9001
  • ISO 14001
  • ISO 45001
  • IATF 16949
  • AAR M-1003
  • IRIS
  • CRCC
  • TSI

Certifications held by our bearing and rail partners.

Bearing durability test rigCoordinate measuring machineTechnicians commissioning machinery

News & insights.

All news
Heavy transport fleet delivered and registered

Supply

Heavy transport fleet delivered and registered

Inside the plants that make our bearings

Partnerships

Inside the plants that make our bearings

Landscape works completed for a residential compound

Contracting

Landscape works completed for a residential compound

Request a quotation

Tell us the need.

We will come back with a technical and commercial proposal — matched to your specification.

Interested in